methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumMediumHighLow
Timedifferent
Ongoing45-90 min90-180 min15-30 min
Participantsdifferent
2-122-53-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsA3 Report, Action Plan, Root Cause AnalysisCoD Table, Prioritization SequenceRoot cause notes, Countermeasures
Tagsno overlap
FlowVisual managementDelivery
LeanProblem solvingCoachingOperations
PrioritizationDeliveryEconomicsDecision
Root causeIncidentLeanProblem solving
Add more methods