View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Operations PDCA Cycle | ![]() Product Discovery Test Card | ![]() Product Discovery Fake Door Test |
|---|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. |
Complexitydifferent | Medium | Low | Low | Medium |
Timedifferent | 0.5-5 Tage | 1 h bis mehrere Wochen | 20-35 min | 1-5 Tage |
Participantsdifferent | 4-10 | 1-8 | 1-5 | Nutzertraffic |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Async |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Test Card with a pre-set threshold | Click Data, Interest Signal, Learning Decision |
Tagsno overlap | LeanContinuous improvementOperations | Continuous improvementLeanExperiments | ExperimentsValidationDiscoveryHypothesis | ValidationExperimentsDemandDiscovery |



