View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Operations PDCA Cycle | ![]() Operations DMAIC | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Medium | Low | High | High |
Timedifferent | 0.5-5 Tage | 1 h bis mehrere Wochen | 2-12 Wochen | 2-6 h |
Participantsdifferent | 4-10 | 1-8 | 3-10 | 3-10 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Project Charter, Measurement Plan, Cause Analysis, Control Plan | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | LeanContinuous improvementOperations | Continuous improvementLeanExperiments | Continuous improvementQualityProcess improvement | RiskQualityOperationsRoot cause |



