View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Operations Kepner-Tregoe | ![]() Facilitation Decision Jam | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | High | Low | Low |
Timedifferent | 0.5-5 Tage | 2-8 h | 60-90 min | 15-30 min |
Participantsdifferent | 4-10 | 2-8 | 4-10 | 2-6 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Problem Analysis, Decision Analysis, Risk Plan | Problem Cluster, Prioritized Challenge, Experiment | Root cause notes, Countermeasures |
Tagsno overlap | LeanContinuous improvementOperations | Problem solvingRoot causeDecisionOperations | FacilitationDecisionProblem solvingWorkshop | Root causeIncidentLeanProblem solving |



