methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for DACI
Decision Making
DACI
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighLowLow
Timedifferent
0.5-5 Tage2-8 h30-60 min15-30 min
Participantsdifferent
4-102-82-102-6
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateProblem Analysis, Decision Analysis, Risk PlanDACI Matrix, Decision Owner, Decision LogRoot cause notes, Countermeasures
Tagsno overlap
LeanContinuous improvementOperations
Problem solvingRoot causeDecisionOperations
DecisionRolesGovernanceAlignment
Root causeIncidentLeanProblem solving
Add more methods