methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Purposedifferent
For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
0.5-5 TageOngoing2-8 h1-3 h
Participantsdifferent
4-102-122-84-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateKanban board, WIP policies, Flow metricsProblem Analysis, Decision Analysis, Risk PlanCurrent-state map, Future-state map, Bottleneck list
Tagsno overlap
LeanContinuous improvementOperations
FlowVisual managementDelivery
Problem solvingRoot causeDecisionOperations
LeanFlowWasteDelivery
Add more methods