View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Engineering Kanban | ![]() Operations Failure Mode and Effects Analysis | ![]() Delivery Value Stream Mapping |
|---|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. |
Complexitydifferent | Medium | Medium | High | Medium |
Timedifferent | 0.5-5 Tage | Ongoing | 2-6 h | 1-3 h |
Participantsdifferent | 4-10 | 2-12 | 3-10 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Kanban board, WIP policies, Flow metrics | FMEA Table, Risk Priority, Mitigation Actions | Current-state map, Future-state map, Bottleneck list |
Tagsno overlap | LeanContinuous improvementOperations | FlowVisual managementDelivery | RiskQualityOperationsRoot cause | LeanFlowWasteDelivery |



