View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Operations Gemba Walk | ![]() Operations Kepner-Tregoe | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | Low | High | Low |
Timedifferent | 0.5-5 Tage | 30-120 min | 2-8 h | 15-30 min |
Participantsdifferent | 4-10 | 2-6 | 2-8 | 2-6 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Observation Notes, Improvement Ideas | Problem Analysis, Decision Analysis, Risk Plan | Root cause notes, Countermeasures |
Tagsno overlap | LeanContinuous improvementOperations | LeanObservationProcessOperations | Problem solvingRoot causeDecisionOperations | Root causeIncidentLeanProblem solving |



