methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
MediumLowLowHigh
Timedifferent
0.5-5 Tage60-90 min15-30 min2-8 h
Participantsdifferent
4-104-102-62-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Kaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateProblem Cluster, Prioritized Challenge, ExperimentRoot cause notes, CountermeasuresProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
LeanContinuous improvementOperations
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
Problem solvingRoot causeDecisionOperations
Add more methods