methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
HighMediumMediumHigh
Timedifferent
1-5 Tage60-90 min1-2 hHalf day
Participantsdifferent
4-123-64-123-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Logic Model, Change Objectives, Intervention Components, Evaluation PlanSalience Diagram, Strategy per ClassAlignment Map, Open Issues, Decision QuestionsLeverage Map, Action Strategy
Tagsno overlap
ChangeSystems thinkingCapability
StakeholdersFacilitationAlignmentGovernance
AlignmentStakeholdersStrategyFacilitation
Systems thinkingChangeStrategy
Add more methods