View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Facilitation Power Interest Grid | ![]() Systems Thinking Leverage Points | ![]() Facilitation Stakeholder Salience Model |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. |
Complexitydifferent | High | Low | High | Medium |
Timedifferent | 1-5 Tage | 30-60 min | Half day | 60-90 min |
Participantsdifferent | 4-12 | 2-8 | 3-12 | 3-6 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Power Interest Grid, Strategy per Stakeholder | Leverage Map, Action Strategy | Salience Diagram, Strategy per Class |
Tagsno overlap | ChangeSystems thinkingCapability | StakeholdersFacilitationAlignmentPlanning | Systems thinkingChangeStrategy | StakeholdersFacilitationAlignmentGovernance |



