View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Facilitation Power Interest Grid | ![]() Systems Thinking Future Reality Tree | ![]() Facilitation Stakeholder Mapping |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first. |
Complexitydifferent | High | Low | High | Low |
Timedifferent | 1-5 Tage | 30-60 min | 2-4 h | 60–90 min |
Participantsdifferent | 4-12 | 2-8 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Power Interest Grid, Strategy per Stakeholder | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Stakeholder Map, Engagement Plan, Risk Notes |
Tagsno overlap | ChangeSystems thinkingCapability | StakeholdersFacilitationAlignmentPlanning | Theory of ConstraintsSystems thinkingChange | StakeholdersAlignmentFacilitationChange |



