View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Operations PDCA Cycle | ![]() Operations A3 Problem Solving | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | High | Low | Medium | High |
Timedifferent | 1-5 Tage | 1 h bis mehrere Wochen | 45-90 min | 2-4 h |
Participantsdifferent | 4-12 | 1-8 | 2-5 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | A3 Report, Action Plan, Root Cause Analysis | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | ChangeSystems thinkingCapability | Continuous improvementLeanExperiments | LeanProblem solvingCoachingOperations | Theory of ConstraintsSystems thinkingChange |



