methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Gemba Walk workspace showing the question, observations, and next decision.
Operations
Gemba Walk
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
HighLowMediumHigh
Timedifferent
1-5 Tage30-120 min0.5-5 Tage2-4 h
Participantsdifferent
4-122-64-103-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Logic Model, Change Objectives, Intervention Components, Evaluation PlanObservation Notes, Improvement IdeasKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
ChangeSystems thinkingCapability
LeanObservationProcessOperations
LeanContinuous improvementOperations
Theory of ConstraintsSystems thinkingChange
Add more methods