View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Systems Thinking Future Reality Tree | ![]() Product Discovery Fake Door Test | ![]() Product Discovery MVP Test Matrix |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. |
Complexitydifferent | High | High | Medium | Medium |
Timedifferent | 1-5 Tage | 2-4 h | 1-5 Tage | 45-75 min |
Participantsdifferent | 4-12 | 3-8 | Nutzertraffic | 2-8 |
Formatdifferent | Workshop + async | Workshop | Async | Workshop |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Click Data, Interest Signal, Learning Decision | Test Matrix, Test Plan |
Tagsno overlap | ChangeSystems thinkingCapability | Theory of ConstraintsSystems thinkingChange | ValidationExperimentsDemandDiscovery | ExperimentsValidationDiscoveryOptions |



