View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Systems Thinking Future Reality Tree | ![]() Facilitation Consensus Workshop | ![]() Facilitation Decision Jam |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. |
Complexitydifferent | High | High | Medium | Low |
Timedifferent | 1-5 Tage | 2-4 h | 1-3 h | 60-90 min |
Participantsdifferent | 4-12 | 3-8 | 5-30 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Consensus Clusters, Theme Titles, Priority Areas | Problem Cluster, Prioritized Challenge, Experiment |
Tagsno overlap | ChangeSystems thinkingCapability | Theory of ConstraintsSystems thinkingChange | FacilitationConsensusWorkshopAlignment | FacilitationDecisionProblem solvingWorkshop |



