methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a branching impact map with a Why goal at the root, actor circles, How behavior changes and What options.
Product Strategy
Impact Mapping
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration of GIST Planning with its method-specific working model.
Product Strategy
GIST Planning
Purposedifferent
When a goal needs to be connected to several possible paths, it shows chains of impact instead of feature lists. It connects business goal, behavior change, and measures.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.GIST Planning helps clarify target groups, value, goals, and priorities. It links customer value, product logic, and decision priorities, and captures the result as goals, an idea bank, and a step-project list.
Complexitysame
MediumMediumMediumMedium
Timedifferent
45-90 min2–4 h review as a planning range; preparation and evaluation additional30-180 minWochen bis Monate je Goal
Participantsdifferent
3-8Designers, developers as users, and facilitation1-63-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Impact Map, Outcome Hypotheses, Delivery OptionsPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsFault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaGoals, Idea bank, Step-project list, Tasks, Learning reports
Tagsno overlap
OutcomesStrategyBehaviorPlanning
ArchitectureEngineeringFeedbackValidationTasks
TroubleshootingDiagnosisEngineering
RoadmapOutcomesPlanningExperiments
Add more methods