methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
LowMediumHighHigh
Timedifferent
15-60 minlaufendHalf day2-4 h
Participantsdifferent
2-92-123-123-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Ideal Day Estimates, Assumption Notes, Capacity CaveatsThroughput Data, Flow Forecast, Slicing RulesLeverage Map, Action StrategyFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
EstimationEffortAgile
EstimationForecastingFlow
Systems thinkingChangeStrategy
Theory of ConstraintsSystems thinkingChange
Add more methods