Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Systems Mapping method illustration showing its working structure
Systems Thinking
Systems Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.Systems Mapping arranges elements, relationships, and boundaries so a complex field becomes legible at a glance. The overview stabilizes the overall picture before detail work or steering begins.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
LowHighMediumHigh
Timedifferent
15-60 minHalf day1-3 h2-4 h
Participantsdifferent
2-93-123-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Ideal Day Estimates, Assumption Notes, Capacity CaveatsLeverage Map, Action StrategySystem Map, Dependencies, Leverage PointsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
EstimationEffortAgile
Systems thinkingChangeStrategy
Systems thinkingMappingBoundariesChange
Theory of ConstraintsSystems thinkingChange
Add more methods