methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Purposedifferent
When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.
Complexitydifferent
LowHighHighMedium
Timedifferent
15-60 min2-4 h1-5 Tage60-120 min
Participantsdifferent
2-93-84-122-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Ideal Day Estimates, Assumption Notes, Capacity CaveatsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLogic Model, Change Objectives, Intervention Components, Evaluation PlanConflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments
Tagsno overlap
EstimationEffortAgile
Theory of ConstraintsSystems thinkingChange
ChangeSystems thinkingCapability
Theory of ConstraintsAssumptionsSystems thinking
Add more methods