methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Context Map workspace showing the question, observations, and next decision.
Domain Modeling
Context Map
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When several contexts need to talk to each other, it makes their relationships and dependencies legible. It helps sort integration pressure and responsibilities across system boundaries.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
LowHighMediumHigh
Timedifferent
15-60 min2-4 h1-3 hHalf day
Participantsdifferent
2-93-82-83-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Ideal Day Estimates, Assumption Notes, Capacity CaveatsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsContext Map, Integration Patterns, Boundary NotesLeverage Map, Action Strategy
Tagsno overlap
EstimationEffortAgile
Theory of ConstraintsSystems thinkingChange
Domain-Driven DesignBoundariesStrategy
Systems thinkingChangeStrategy
Add more methods