View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Knowledge Modeling IBIS | ![]() Operations Theory of Constraints | ![]() Operations Kepner-Tregoe | ![]() Operations A3 Problem Solving |
|---|---|---|---|---|
Purposedifferent | IBIS structures thinking about complex questions as a sequence of issues, ideas, and arguments. The method keeps discussions open without forcing them into premature consensus. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. |
Complexitydifferent | Medium | High | High | Medium |
Timedifferent | 1-3 h | 2-4 h Analyse, laufend | 2-8 h | 45-90 min |
Participantsdifferent | 2-8 | 3-12 | 2-8 | 2-5 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Issue Map, Positions, Argument Notes | Constraint Map, Improvement Plan, Flow Metrics | Problem Analysis, Decision Analysis, Risk Plan | A3 Report, Action Plan, Root Cause Analysis |
Tagsno overlap | RationaleKnowledgeDecision | OperationsConstraintsFlowImprovement | Problem solvingRoot causeDecisionOperations | LeanProblem solvingCoachingOperations |



