methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
How Might We
Innovation
How Might We
Paper illustration for Risk Storming.
Architecture
Risk Storming
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
With a stuck problem carrying many implicit assumptions, the method translates observations into open, workable questions. It sharpens the problem frame without pre-thinking the solution, turning frustration or fuzziness into a search space with clear direction.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowHighHigh
Timedifferent
30–45 min60-90 min1-4 WochenSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-104-121-6Evaluation team, architects, and relevant stakeholders
Formatdifferent
Workshop + asyncWorkshopAsyncWorkshop + async
Outputdifferent
HMW Questions, Challenge Framing, Idea PromptsAnnotated Diagram, Prioritized Risk List, Action BacklogExperiment results, Decision log, Learning summaryPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
FramingOpportunityIdeationQuestions
RiskArchitectureWorkshopValidation
ExperimentsGrowthAnalyticsValidation
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods