methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Goal Question Metric with its method-specific working model.
Engineering
Goal Question Metric
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
MediumLowMediumMedium
Timedifferent
90-180 min1-2 Tage1-3 Tage1-2 h
Participantsdifferent
3-61-41-44-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
GQM Table, Metric ProfilesArchitecture Document, Context View, Runtime View, Deployment ViewArchitecture Views, Cross-view Notes, RationaleAlignment Map, Open Issues, Decision Questions
Tagsno overlap
MetricsMeasurementEngineeringAlignment
ArchitectureDocumentationCommunication
DocumentationStakeholdersArchitecture
AlignmentStakeholdersStrategyFacilitation
Add more methods