View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Getting Things Done | ![]() Innovation Rapid Ideation | ![]() Innovation Crazy 8s | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory. | When a decision needs to be prepared quickly, the method generates many solution-close variants in a short time. It deliberately relies on pace to undercut self-censorship and perfectionism. This quickly produces a usable field for prioritization and further work. | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 1-2 h Setup, laufend | 5-20 min | 8-15 min | 45-90 min |
Participantsdifferent | 1 | 1-20 | 1-10 | 3-10 |
Formatdifferent | Async | Workshop + async | Workshop | Workshop |
Outputdifferent | Action Lists, Project List, Review Routine | Ideenpool, Roh-Shortlist, Cluster | Sketch Set, Idea Shortlist, Direction Options | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | ProductivityPlanningTasksExecution | BrainstormingIdeationDivergenceSpeed | BrainstormingSketchingSpeedDivergenceDesign sprint | BrainstormingIdeationCreativityDivergenceWorkshop |



