methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper notes move from an inbox to action, project and calendar collections.
Operations
Getting Things Done
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration for Risk Storming.
Architecture
Risk Storming
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory.When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
1-2 h Setup, laufend1-3 h60-90 min2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
15-304-12Designers, developers as users, and facilitation
Formatdifferent
AsyncWorkshopWorkshopWorkshop + async
Outputdifferent
Action Lists, Project List, Review RoutineConsensus Clusters, Theme Titles, Priority AreasAnnotated Diagram, Prioritized Risk List, Action BacklogPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
ProductivityPlanningTasksExecution
FacilitationConsensusWorkshopAlignment
RiskArchitectureWorkshopValidation
ArchitectureEngineeringFeedbackValidationTasks
Add more methods