methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper notes move from an inbox to action, project and calendar collections.
Operations
Getting Things Done
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumLowMediumLow
Timedifferent
1-2 h Setup, laufend45-90 min2–4 h review as a planning range; preparation and evaluation additional60-90 min
Participantsdifferent
12-8Designers, developers as users, and facilitation4-12
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Action Lists, Project List, Review RoutineAssumption List, Critical Assumptions, Learning PlanPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ProductivityPlanningTasksExecution
AssumptionsRiskDecisionDiscovery
ArchitectureEngineeringFeedbackValidationTasks
RiskArchitectureWorkshopValidation
Add more methods