View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Gemba Walk | ![]() Innovation Worst Possible Idea | ![]() Innovation Rapid Ideation | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. | For a seemingly familiar problem with paralyzing seriousness, the method dissolves pressure and fear of judgment. It deliberately makes failure pictures extreme, so hidden assumptions become visible faster. This clarifies what a workable path should avoid. | When a decision needs to be prepared quickly, the method generates many solution-close variants in a short time. It deliberately relies on pace to undercut self-censorship and perfectionism. This quickly produces a usable field for prioritization and further work. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitysame | Low | Low | Low | Low |
Timedifferent | 30-120 min | 20-45 min | 5-20 min | 45-90 min |
Participantsdifferent | 2-6 | 3-12 | 1-20 | 3-10 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Observation Notes, Improvement Ideas | Bad Idea List, Reframed Concepts, Idea Shortlist | Ideenpool, Roh-Shortlist, Cluster | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | LeanObservationProcessOperations | IdeationCreativityDivergence | BrainstormingIdeationDivergenceSpeed | BrainstormingIdeationCreativityDivergenceWorkshop |



