methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Gap Analysis method illustration showing its working structure
Business Strategy
GAP Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
GAP Analysis compares the current state with a target picture and makes the distance manageable. It becomes useful when, ahead of new initiatives, it must become clear which capabilities, processes, or resources are missing.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumLowMediumLow
Timedifferent
1-3 h20–45 min2–4 h review as a planning range; preparation and evaluation additional60-90 min
Participantsdifferent
2-8Small cross-functional groupDesigners, developers as users, and facilitation4-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Gap Matrix, Action Plan, Risk NotesRisk list, Mitigation plan, Assumption logPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
StrategyAnalysisPlanning
RiskDecisionFailurePlanning
ArchitectureEngineeringFeedbackValidationTasks
RiskArchitectureWorkshopValidation
Add more methods