methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
Paper illustration for Risk Storming.
Architecture
Risk Storming
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighLowMediumMedium
Timedifferent
Halber Tag60-90 min45-90 min45-60 min
Participantsdifferent
5-204-122-52-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Simulation Notes, Gaps List, Updated RunbooksAnnotated Diagram, Prioritized Risk List, Action BacklogA3 Report, Action Plan, Root Cause AnalysisAssumption map, Test backlog, Risk ranking
Tagsno overlap
ResilienceOperationsIncident
RiskArchitectureWorkshopValidation
LeanProblem solvingCoachingOperations
AssumptionsRiskExperimentsValidation
Add more methods