View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() DevOps Game Day | ![]() Decision Making Pre-Mortem | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations Kepner-Tregoe |
|---|---|---|---|---|
Purposedifferent | In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. |
Complexitydifferent | High | Low | High | High |
Timedifferent | Halber Tag | 20–45 min | 2-6 h | 2-8 h |
Participantsdifferent | 5-20 | Small cross-functional group | 3-10 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Simulation Notes, Gaps List, Updated Runbooks | Risk list, Mitigation plan, Assumption log | FMEA Table, Risk Priority, Mitigation Actions | Problem Analysis, Decision Analysis, Risk Plan |
Tagsno overlap | ResilienceOperationsIncident | RiskDecisionFailurePlanning | RiskQualityOperationsRoot cause | Problem solvingRoot causeDecisionOperations |



