View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() DevOps Game Day | ![]() Decision Making Assumption Surfacing | ![]() Decision Making Pre-Mortem | ![]() Decision Making Constraint Analysis |
|---|---|---|---|---|
Purposedifferent | In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. |
Complexitydifferent | High | Low | Low | Low |
Timedifferent | Halber Tag | 45-90 min | 20–45 min | 30-90 min |
Participantsdifferent | 5-20 | 2-8 | Small cross-functional group | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Simulation Notes, Gaps List, Updated Runbooks | Assumption List, Critical Assumptions, Learning Plan | Risk list, Mitigation plan, Assumption log | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries |
Tagsno overlap | ResilienceOperationsIncident | AssumptionsRiskDecisionDiscovery | RiskDecisionFailurePlanning | ConstraintsDecisionPlanningOptions |



