methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Futures Wheel with its method-specific working model.
Systems Thinking
Futures Wheel
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
The Futures Wheel helps explore the consequences of a decision, a trend, or a strategic move in a structured way. It makes visible which first, second, and third-order effects could arise from an event.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
60-120 min10-30 min je Item2-4 hHalf day
Participantsdifferent
3-101-83-83-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Futures Wheel, Consequence Chains, Strategic SignalsThree-Point Estimate, Risk Range, Assumption NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLeverage Map, Action Strategy
Tagsno overlap
ForesightSystems thinkingSignals
EstimationUncertaintyForecasting
Theory of ConstraintsSystems thinkingChange
Systems thinkingChangeStrategy
Add more methods