methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Futures Wheel with its method-specific working model.
Systems Thinking
Futures Wheel
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
The Futures Wheel helps explore the consequences of a decision, a trend, or a strategic move in a structured way. It makes visible which first, second, and third-order effects could arise from an event.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
MediumLowHighHigh
Timedifferent
60-120 min30-60 min90-180 min2-8 h
Participantsdifferent
3-101-53-82-8
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop + async
Outputdifferent
Futures Wheel, Consequence Chains, Strategic SignalsABC Classification, Focus Rules, Control ListCoD Table, Prioritization SequenceProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
ForesightSystems thinkingSignals
PrioritizationOperationsPortfolio
PrioritizationDeliveryEconomicsDecision
Problem solvingRoot causeDecisionOperations
Add more methods