methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.
Complexitydifferent
HighMediumMediumHigh
Timedifferent
2-4 h1-3 h60-120 min1-5 Tage
Participantsdifferent
3-84-102-84-12
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved InjectionsCurrent-state map, Future-state map, Bottleneck listConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsLogic Model, Change Objectives, Intervention Components, Evaluation Plan
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
LeanFlowWasteDelivery
Theory of ConstraintsAssumptionsSystems thinking
ChangeSystems thinkingCapability
Add more methods