View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Intervention Mapping | ![]() Agile NoEstimates |
|---|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules. |
Complexitydifferent | High | Medium | High | Medium |
Timedifferent | 2-4 h | 10-30 min je Item | 1-5 Tage | laufend |
Participantsdifferent | 3-8 | 1-8 | 4-12 | 2-12 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Three-Point Estimate, Risk Range, Assumption Notes | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Throughput Data, Flow Forecast, Slicing Rules |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | EstimationUncertaintyForecasting | ChangeSystems thinkingCapability | EstimationForecastingFlow |



