methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of a team retrospective with three separate Start, Stop, and Continue areas and a shared action list.
Agile
Start Stop Continue
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture.
Complexitydifferent
HighLowHighLow
Timedifferent
2-4 h30-60 minHalf day45-90 min
Participantsdifferent
3-83-123-124-12
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved InjectionsStart Stop Continue Board, Improvement ActionsLeverage Map, Action StrategySailboat Board, Risks, Improvement Actions
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
RetrospectiveImprovementTeamReflection
Systems thinkingChangeStrategy
RetrospectiveTeamImprovement
Add more methods