View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Agile ROAM Board | ![]() Systems Thinking Evaporating Cloud | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | High | Low | Medium | High |
Timedifferent | 2-4 h | 20-40 min initial, dann laufend | 60-120 min | 1-5 Tage |
Participantsdifferent | 3-8 | 3-15 | 2-8 | 4-12 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | ROAM Board, Owner List | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | RiskAgileTrackingAlignment | Theory of ConstraintsAssumptionsSystems thinking | ChangeSystems thinkingCapability |



