View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Delivery RAID Log | ![]() Systems Thinking CATWOE Analysis | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | High | Low | Medium | High |
Timedifferent | 2-4 h | 30 min Setup, dann laufend | 45-90 min | 1-5 Tage |
Participantsdifferent | 3-8 | 1-3 maintaining, briefing for everyone | 3-8 | 4-12 |
Formatdifferent | Workshop | Async | Workshop + async | Workshop + async |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | RAID Log, Status Report Source | CATWOE Canvas, Root Definition, Stakeholder Perspectives, Constraints | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | RiskTrackingStakeholdersGovernance | Systems thinkingFramingStakeholders | ChangeSystems thinkingCapability |



