View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Pre-Mortem | ![]() Systems Thinking Leverage Points | ![]() Decision Making Force Field Analysis |
|---|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. | In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving. |
Complexitydifferent | High | Low | High | Low |
Timedifferent | 2-4 h | 20–45 min | Half day | 45-90 min |
Participantsdifferent | 3-8 | Small cross-functional group | 3-12 | 3-12 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Risk list, Mitigation plan, Assumption log | Leverage Map, Action Strategy | Force Field Map, Change Levers, Risk Notes |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | RiskDecisionFailurePlanning | Systems thinkingChangeStrategy | ChangeDecisionStrategy |



