methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving.
Complexitydifferent
HighLowLowLow
Timedifferent
2-4 h20–45 min1-2 h45-90 min
Participantsdifferent
3-8Small cross-functional group2-83-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved InjectionsRisk list, Mitigation plan, Assumption logDIBB document, Belief list, Bet list, Learning reportForce Field Map, Change Levers, Risk Notes
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
RiskDecisionFailurePlanning
StrategyDecisionAssumptionsHypothesis
ChangeDecisionStrategy
Add more methods