methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.
Complexitydifferent
HighMediumMediumMedium
Timedifferent
2-4 h15-45 min45-60 min60-120 min
Participantsdifferent
3-81-82-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved InjectionsPERT Estimate, Expected Value, Risk NotesAssumption map, Test backlog, Risk rankingConflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
EstimationUncertaintyRisk
AssumptionsRiskExperimentsValidation
Theory of ConstraintsAssumptionsSystems thinking
Add more methods