View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Engineering Kanban | ![]() Innovation Lean Startup | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For uncertain business assumptions, the method forces the idea into contact with real market reactions early. It separates wishful picture, assumption, and observable behavior, so that learning becomes faster than planning. This translates uncertainty into measurable insight. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | High | Medium | Medium | High |
Timedifferent | 2-4 h | Ongoing | Wochen bis Monate je Lernzyklus | 1-5 Tage |
Participantsdifferent | 3-8 | 2-12 | 2-8 | 4-12 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Kanban board, WIP policies, Flow metrics | Hypothesis list, MVPs, Learning reports, Pivot or persevere decision | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | FlowVisual managementDelivery | LeanStartupValidationMVP | ChangeSystems thinkingCapability |



