methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitysame
HighHighHighHigh
Timedifferent
2-4 h90-180 min1-5 TageHalf day
Participantsdifferent
3-83-84-123-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved InjectionsCoD Table, Prioritization SequenceLogic Model, Change Objectives, Intervention Components, Evaluation PlanLeverage Map, Action Strategy
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
PrioritizationDeliveryEconomicsDecision
ChangeSystems thinkingCapability
Systems thinkingChangeStrategy
Add more methods