View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Assumption Surfacing | ![]() Facilitation Consensus Workshop | ![]() Facilitation Decision Jam |
|---|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. |
Complexitydifferent | High | Low | Medium | Low |
Timedifferent | 2-4 h | 45-90 min | 1-3 h | 60-90 min |
Participantsdifferent | 3-8 | 2-8 | 5-30 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Assumption List, Critical Assumptions, Learning Plan | Consensus Clusters, Theme Titles, Priority Areas | Problem Cluster, Prioritized Challenge, Experiment |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | AssumptionsRiskDecisionDiscovery | FacilitationConsensusWorkshopAlignment | FacilitationDecisionProblem solvingWorkshop |



