methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration for Mad Sad Glad
Agile
Mad Sad Glad
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When a sprint should not only be assessed but also learned from, it captures experience in clear learning categories. It records what worked, what's missing, and what should run differently next time.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.When a team's or workshop's mood needs to become readable, it structures emotional signals with little setup. It makes strain, relief, and sources of energy tangible.
Complexitydifferent
HighLowHighLow
Timedifferent
2-4 h45–75 min1-5 Tage30-60 min
Participantsdifferent
3-8Team members involved4-123-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved Injections4Ls Board, Learning Themes, Improvement ActionsLogic Model, Change Objectives, Intervention Components, Evaluation PlanEmotion Board, Themes, Action Items
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
RetrospectiveLearningReflectionTeam
ChangeSystems thinkingCapability
RetrospectiveTeamReflection
Add more methods