View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Failure Mode and Effects Analysis | ![]() Decision Making Assumption Surfacing | ![]() Operations ALPEN Method | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | High | Low | Low | Low |
Timedifferent | 2-6 h | 45-90 min | 10-20 min daily | 20–45 min |
Participantsdifferent | 3-10 | 2-8 | 1 | Small cross-functional group |
Formatdifferent | Workshop | Workshop + async | Async | Workshop |
Outputdifferent | FMEA Table, Risk Priority, Mitigation Actions | Assumption List, Critical Assumptions, Learning Plan | Daily Plan, Time Estimates, Review Notes | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | RiskQualityOperationsRoot cause | AssumptionsRiskDecisionDiscovery | PlanningTime managementProductivityOperations | RiskDecisionFailurePlanning |



