methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Flywheel.
Growth
Flywheel
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
Growth often breaks down where a reinforcing mechanism builds up too much friction. A Flywheel shows the cycle of value, repetition, and reinforcement meant to sustain growth.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumLowLowHigh
Timedifferent
60-120 min45-90 min30-60 min90-180 min
Participantsdifferent
3-82-83-103-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Flywheel Map, Friction Points, Growth Levers, Experiment BacklogAssumption List, Critical Assumptions, Learning PlanRisk Matrix, Top Risk ListCoD Table, Prioritization Sequence
Tagsno overlap
GrowthRetentionConversion
AssumptionsRiskDecisionDiscovery
RiskDecisionPrioritizationAssessment
PrioritizationDeliveryEconomicsDecision
Add more methods