View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:5-Minuten VC-CheckARID (Active Reviews for Intermediate Designs)Failure Mode and Effects AnalysisRisk Storming
| Criterion | ![]() Business Strategy 5-Minuten VC-Check | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Operations Failure Mode and Effects Analysis | ![]() Architecture Risk Storming |
|---|---|---|---|---|
Purposedifferent | The 5-Minute VC Check clarifies opportunities and strategic options at the earliest idea stage. It compares problem quality, customer willingness to pay, alternatives, differentiation, and market potential, and captures the result as a VC-check note, go/sharpen/park decision, and risk list. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 5-15 min | 2–4 h review as a planning range; preparation and evaluation additional | 2-6 h | 60-90 min |
Participantsdifferent | 1-5 | Designers, developers as users, and facilitation | 3-10 | 4-12 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | VC-check note, Go/sharpen/park decision, Risk and assumption list, Next validation step | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | FMEA Table, Risk Priority, Mitigation Actions | Annotated Diagram, Prioritized Risk List, Action Backlog |
Tagsno overlap | StartupValidationCompetition | ArchitectureEngineeringFeedbackValidationTasks | RiskQualityOperationsRoot cause | RiskArchitectureWorkshopValidation |



