View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fault Tree Analysis | ![]() Decision Making Risk Matrix | ![]() Product Discovery Assumption Mapping | ![]() Operations Barrier Analysis |
|---|---|---|---|---|
Purposedifferent | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. |
Complexitydifferent | High | Low | Medium | Medium |
Timedifferent | 2-6 h | 30-60 min | 45-60 min | 2-4 h |
Participantsdifferent | 3-8 | 3-10 | 2-8 | 2-6 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Risk Matrix, Top Risk List | Assumption map, Test backlog, Risk ranking | Barrier Inventory, Failure Analysis per Barrier, Action Backlog |
Tagsno overlap | RiskRoot causeSafety | RiskDecisionPrioritizationAssessment | AssumptionsRiskExperimentsValidation | Root causeSafetyIncident |



